Crane Pre-Shift Inspection Checklist
Daily crane pre-shift inspection checklist. Operator, logbook, structure, hooks, ropes, outriggers, safety devices, load chart, fluid leaks.
About This Checklist
This lifting inspection checklist is aligned with OSHA, ISO 45001, and industry best practice. It can be printed and used as-is, or upgraded to a digital workflow in HSEKit for photo evidence, auto-routing of failures, and trend analytics.
When to Use It
- Pre-shift / pre-use inspections (typical daily)
- Periodic compliance inspections (weekly / monthly / quarterly)
- Following any incident or near-miss
- After equipment maintenance or modification
Checklist
- Item 1 — initial conditions, permits in place, equipment in date
- Item 2 — visual inspection, signs of damage, wear, corrosion
- Item 3 — safety devices operational (guards, interlocks, alarms)
- Item 4 — operator / personnel competency verified
- Item 5 — controls tested and operating correctly
- Item 6 — emergency equipment in place (extinguisher, eyewash, first aid)
- Item 7 — housekeeping, lighting, ventilation
- Item 8 — documentation (log book, certificate, last inspection)
- Item 9 — environmental conditions acceptable (weather, noise, fumes)
- Item 10 — sign-off and routing of any failures
⚠️ This is a generic template. Customize for your equipment, site, and standard.
What to Do With Failures
Any item marked "Fail" must be resolved before the equipment is used or work continues. Document the failure with photos, notify the supervisor, create a CAPA in HSEKit, and follow up to verify the fix is effective. Repeat failures indicate a systemic issue that should trigger a risk assessment review.
Replace paper with HSEKit. Mobile-first inspections, photo evidence, auto-CAPA, trend analytics, scheduled recurring inspections.